Construction progress

Two slabs cast, third slab formwork erected

Last updated October 16, 2026

Overall progress: 20%. Approximate engineering estimate.

  1. | 20%

    Two slabs cast, third slab formwork erected

    • Front view from the access road, with neighbouring buildings
    • Street-front view of the concrete frame: two cast slabs with formwork for the next slab on top
    • Frame seen from the street, left corner with neighbouring skeletons
    • Full frontal view, two cast slabs and formwork on top
    • Front bays: curved slab edge, column grid and third-slab formwork above
    • Close view of ground and first-floor columns and the curved slab edge
  2. | 16%

    Timber decking and column starter bars on the deck, neighbours visible

    low confidence on which deck this is

    • View from the formwork deck: timber decking, column starter bars and the access road
  3. | 15%

    Slab reinforcement complete, concrete pump on site, pour

    walkaround-03 shows one cast slab with column forms/shuttering above, pump boom nearby

    • Concrete pump set up beside the building; slab reinforcement mat and curved edge formwork
    • Walk-around of the frame from ground level: columns, one cast slab, formwork above

Site location

Project site on the map

30.355088, 31.732449